GMP Production Unit

Our proposed GMP production unit will be located at Chakan PH-2, MIDC, Pune Maharashtra India. Plot area 55000.00 Sq ft. The site is under construction and will be ready tentatively by June-2023. The proposed GMP unit will be designed to manufacture more than 50 Kg of Peptide APIs per year. This facility will be equipped with 10 L, 20 L, 50L, and 100 L. Solid Phase Peptide Synthesis (SPPS) reactors, Preparative HPLC (3-6L/min) with 200, 300, 600 mm DAC Column, and Tray freeze dryer of ice condenser capacity up to 100 kg.

For nucleosides and oligonucleotides, a separate stream will be designed to manufacture the GMP grade material from multigram to kg scale.

Careers

Our proposed GMP production unit will be located at Chakan PH-2, MIDC, Pune Maharashtra India. Plot area 55000.00 Sq ft. The site is under construction and will be ready tentatively by June-2023. The proposed GMP unit will be designed to manufacture more than 50 Kg of Peptide APIs per year. This facility will be equipped with 10 L, 20 L, 50L, and 100 L. Solid Phase Peptide Synthesis (SPPS) reactors, Preparative HPLC (3-6L/min) with 200, 300, 600 mm DAC Column, and Tray freeze dryer of ice condenser capacity up to 100 kg.

For nucleosides and oligonucleotides, a separate stream will be designed to manufacture the GMP grade material from multigram to kg scale.

Lorem ipsum dolor sit amet

Praesent id enim sit amet.Tdio vulputate eleifend in in tortor. ellus massa. sitiMassa ristique sit amet condim vel,.

  • Praesent id enim sit amet.Tdio vulputate
  • Eleifend in in tortor. ellus massa.Dristique sitii
  • Massa ristique sit amet condim vel

Fringilla urna porttitor

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed tempor incididunt ut labore et dolore magna aliqua. Venena metus vulputate eu scelerisque felis.
Vel pretium lectus quam id leo in vitae turpis massa. Nunc metus aliquam. Libero id faucibus nisl tincidunt eget.